A pharma and medtech manufacturer struggled with high downtime in largely manual assembly processes, resulting in output that fell short of market demand.

The challenge

The situation

A pharma and medtech manufacturer suffered from high downtime and loss times in its largely manual assembly processes, resulting in output that fell short of market demand. A lack of resource planning and ineffective bottleneck management further compounded the production inefficiencies.

Our approach

What we delivered

01

Structured OEE measurement and control with systematic root-cause analysis for downtime

02

Resource planning and workforce flexibilisation through cross-training programmes

03

Integrated production management with communication loops and coordinated planning tools for bottleneck control

The outcome

Results & impact

20% more production output

Increase in production output of 20 percent.

1 sustainable change mentality

Performance-oriented change culture established across the organisation.

0 unplanned downtime

Unplanned downtime significantly reduced through structured root-cause analysis.

3 process improvement initiatives

Optimisation, process improvement and cost reduction implemented as initiatives.

In summary

The manufacturer increased production output by 20 percent and established a sustainable, performance-oriented change culture, with unplanned downtime significantly reduced.

Sources
  • Entourage project experience (anonymised)

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +49 89 4161170-0
info@theentourage.us

  • Reply usually within one working day
  • 4 offices: DE · CH · IT · US
  • 100% life sciences