A change to a certified device ends in one of three places: an internal change
with a documented rationale, a change the notified body has to approve
before release, or a change that reopens the conformity assessment. Which one
applies depends on the certificate and on the market.
Under the MDR, the test depends on the conformity assessment route. Annex IX
Section 4.10 covers devices with an EU technical documentation assessment
certificate, which on the Annex IX route means class III and the class IIb implantable devices under the second
subparagraph of Art. 52(4): changes that could affect safety and performance or
the conditions prescribed for use need approval, and the notified body decides
between a supplement and a new conformity assessment.
For class IIa and the other class IIb devices, Art. 52(4) and (6) provide for
an assessment of the technical documentation of representative devices. Their
changes go through the notified body's change procedure under Annex VII
Section 4.9. Type-examined devices have their own test in Annex X Section
5.2: changes that may affect conformity with the general safety and
performance requirements or with the conditions prescribed for use.
The IVDR uses the same wording in Annex IX Section 4.11 and adds a
consultation of the EU reference laboratory where a change could affect
compliance with the common specifications; type examination follows Annex X
Section 5. In both regulations, Annex IX Section 2.4 covers plans for
substantial changes to the quality management system or the device range, and
the notified body decides whether they need additional audits.
In the US, the threshold is 21 CFR 807.81(a)(3): a new 510(k) when a change
could significantly affect safety or effectiveness, or when the intended use
changes in a major way. Two FDA guidance documents, one for software, work
through it with flowcharts. For PMA devices, 21 CFR 814.39 governs
supplements.
| EU, technical documentation assessment certificate | US, 510(k) or De Novo device | US, PMA device |
|---|
| Test | could affect safety and performance or the conditions prescribed for use | could significantly affect safety or effectiveness, or a major change in intended use | affects safety or effectiveness |
| Who decides | the notified body that issued the certificate | the manufacturer, documented; the FDA if a new 510(k) is filed | the PMA holder first; the FDA on a supplement or a 30-day notice |
| Outcome | supplement to the certificate or new conformity assessment | documented assessment or new 510(k) | PMA supplement, 30-day notice or periodic report |
One route is planned in advance: a change consistent with a cleared
predetermined change control plan (PCCP) under section 515C of the FD&C Act
needs no new 510(k) (21 CFR 807.81(b)(1)(ii)).
Two neighboring topics sit outside this page: the QMS change process under
ISO 13485:2016 Section 7.3.9, and the significant-change test for legacy
devices during the MDR and IVDR transition.